INSTALLING THE UPS SYSTEMEATON Powerware® 9390 UPS (20–80 kVA) Installation and Operation Manual 164201603 Rev 2 www.powerware.com4-1012. Remove the screws securing the bottom internal safety shield panel and removethe panel to gain access to the bottom conduit landing plate.NOTE When installing UV trip and Aux battery interface wiring to the UPS interface terminals, conduitmust be installed between the UPS and battery cabinets.13. Remove the UPS cabinet top or bottom conduit landing plate to drill or punchconduit holes (see Drawing 164201603-6 on page A-34).14. Reinstall the conduit landing plate and install the conduit.15. Route the UV trip and Aux wiring from the battery cabinet to the UPS.16. Connect the wiring to the TB1 terminals.17. If wiring X-Slot connections, proceed to paragraph 4.8.3; otherwise, proceed toStep 18.18. When all wiring is complete, reinstall the safety shield panels removed inprevious steps. Secure with the retained hardware.19. Close the control panel door and secure with the retained hardware.20. Reinstall the door removed in Step 3 or paragraph 4.2 and secure with theretained hardware.21. Close the door and secure the latch.4.8.3 X-Slot ConnectionsNOTE LAN and telephone drops for use with X-Slot connectivity cards must be provided by facility plannersor the customer.NOTE When installing external wiring to X-Slot cards, conduit must be installed to the UPS cabinet. Wheninstalling internal wiring to X-Slot terminals, route the wiring through the internal opening in the X-Slotcommunication bay.For installation and setup of an X-Slot card, please contact Eaton (see page 1-7).To install wiring for connections:1. If not already installed, install the LAN and telephone drops.2. Unfasten the front door latch and swing the door open.3. Remove the UPS cabinet X-Slot conduit landing plate to drill or punch conduitholes (see Drawing 164201603-6 on page A-34).4. Reinstall the conduit landing plate and install the conduit.5. Route and install the LAN, telephone, and other cables to the appropriate X-Slotcards.6. When all wiring is complete, reinstall the safety shield panels removed inprevious steps. Secure with the retained hardware.7. Close the control panel door and secure with the retained hardware.