GB KJ 45/SKJ 45/SDate 01-2011 Revisione - 0314AIR FEED (fig. f1)The compressed air system must be provided with aircleaners and condensation drains and must guarantee thatthe air supplied to the feeder has a constant pressure of min6 bars. The regulator must be set at a pressure of 6,5 bars.Connect the machine to the main compressed air supply asshown in the diagram (f1):1) Cutoff cock (used during maintenance of the filter regulatoror of the lubricating unit).2) Main supply inlet.3) Main supply bleed.4) Pressure regulator and filter (bleed daily).5) Lubricating unit.ATTENTION! The riveting tool is equipped with arelief valve (F) starting when the compressed-airpressure significantly exceeds 7 bar.ATTENTION! If the relief valve (F) starts and the airconsequently escapes, we recommend to check ifthe tool feed pressure corresponds to the pressurevalue indicated under the technical data in thishandbook (page 13).FRL UNITPRELIMINARY OPERATIONS (fig. f2-f3)Check that the threaded tie rod (A) and head (B) coupleassembled on the riveting tool is suitable to the size of theinsert to clamp; otherwise change the size (page 17). Thetie-rod (A)/head (B) unit assembled on this riveting tool,corresponds to a M10 thread.Before using the riveting tool and after each change of size, thestroke should be adjusted according to the dimensions, typeof the insert and thickness of the material to clamp. Beforecarrying out this operation rotate the knob (M) accordingto the direction of the arrow, (+) for increasing the strokeand (-) for decreasing it. Increasing the stroke - rotation ofknob (M) - in the direction indicated with the symbol (+), thedistance “h” (page 15) decreases increasing the clampingaction. To verify that the stroke is correctly adjusted check theindicator (N) comparing it with the values of the table (fig. f3).NOTE: Before the definitive placing of the insert, its clampingon the thicknesses involved should be checked, carryingout other adjustments, as shown at page 18 (the specifiedadjustments are just an indication, it is advisable to see thetechnical data of the inserts used).ATTENTION! The incorrect adjustment of theriveting tool can cause a bad clamping of theinserts and a possible break of the tie rod!ATTENTION! The above-mentioned operationsmust be done when the tool is not fed. Forvisualizing the changed stroke (N) the toolmust be fed.f21245 33 m Maxf1FQ• Move up the slider of the air-entry valve (Q) to feed the tool.• Before regulating the stroke, discharge the tool by the air and stopthe feeding, moving down the slider of the air-entry valve (Q).