Section 3 • Scheduled Maintenance ProceduresREV BNovember 2008Part No. 112657 GS-2668 RT • GS-3268 RT 3 - 11A-7Perform Engine Maintenance -Kubota ModelsEngine specifications require that this one timeprocedure be performed after the first 50 hours ofoperation.Required maintenance procedures and additionalengine information is available in theKubota D1105 Operator's Manual(Kubota part number 16622-89166) OR theKubota D905 Operator's Manual(Kubota part number 16622-8916-5).Kubota D1105 Operator's ManualGenie part number 131379Kubota D905 Operator's ManualGenie part number 84240A-8Perform Engine Maintenance -Kubota ModelsEngine specifications require that this procedurebe performed every 50 hours or weekly, whichevercomes first.Required maintenance procedures and additionalengine information is available in theKubota D1105 Operator's Manual(Kubota part number 16622-89166) OR theKubota D905 Operator's Manual(Kubota part number 16622-8916-5) OR theKubota DF752 Operator's Manual(Kubota part number EG601-8916-1).Kubota D1105 Operator's ManualGenie part number 131379Kubota D905 Operator's ManualGenie part number 84240Kubota DF752 Operator's ManualGenie part number 84250CHECKLIST A PROCEDURES