Section 3 • Scheduled Maintenance ProceduresREV BNovember 2008Part No. 112657 GS-2668 RT • GS-3268 RT 3 - 35E-3Perform Engine Maintenance -Gasoline/LPG ModelsEngine specifications require that this procedurebe performed every two years.Required maintenance procedures and additionalengine information is available in theKubotaDF750 Operator's Manual (Kubota part numberEG261-8916-1) OR theKubota DF752 Operator'sManual (Kubota part number EG601-8916-1).Kubota DF750 Operator's ManualGenie part number 97359Kubota DF752 Operator's ManualGenie part number 84250E-4Perform Engine Maintenance -Kubota D1105 ModelsEngine specifications require that this procedurebe performed every two years.Required maintenance procedures and additionalengine information is available in theKubota D1105 Operator's Manual(Kubota part number 16622-89166).Kubota D1105 Operator's ManualGenie part number 131379CHECKLIST E PROCEDURES