REV CSection 3 • Scheduled Maintenance Procedures July 20073 - 40 GS-3390 • GS-4390 • GS-5390 Part No. 72863CHECKLIST E PROCEDURES25 Install the T-fitting with the 2 hoses connectedto it.26 Fill the tank with hydraulic oil until the level iswithin the top 2 inches / 5.1 cm from the top ofthe sight gauge. Do not overfill. Refer to Section2,Specifications.27 Clean up any oil that may have spilled duringthe procedure.28 If equipped, open the hydraulic tank shutoffvalves.Component damage hazard.Be sure to open the two hydraulictank shutoff valves and prime thepump after installing the hydraulictank. Refer to Repair procedure 6-2,How to Prime the Pump.29 Install the access plate and install the accessplate retaining fasteners.30 Install the entry ladder and install the entryladder mounting fasteners.E-2Perform Engine Maintenance -Deutz 1011F ModelsEngine specifications require that this procedurebe performed every 2000 hours or two years,whichever comes first.Required maintenance procedures and additionalengine information is available in theDeutz 1011FOperation Manual (Deutz part number 0297 9683).Deutz 1011F Operation ManualGenie part number 52883