84. Unpack the screws which are packed together with the front mounting brackets, and attach oneend of mounting brackets to the switch, as shown in Figure 4.5. Place the switch on the rack-shelf horizontally, slide the rack-shelf into the rack, and attach theother end of mounting brackets to the front brackets with crews and cage nuts, as shown in Figure5.Rack-mounting by using front and rear mounting bracketsOnly the S5120-28C-PWR-EI and S5120-52C-PWR-EI support installation by using front and rearmounting brackets.To install the switch into a 19-inch standard rack:1. Wear an ESD-preventive wrist strap and make sure it makes good skin contact and is wellgrounded.2. Verify the grounding and stability of the cabinet.3. Unpack the screws which are packed together with the front mounting brackets, and attach oneend of mounting brackets to the switch, as shown in Figure 4.4. Unpack the load-bearing screws (packed together with the rear mounting brackets) and placethem in a proper position on the sides of the switch, as shown in Figure 6.Figure 6 Attaching front mounting brackets and load-bearing screws(1) Load-bearing screw (2) Optional positions for load-bearing screw(3) Front panel (4) Front mounting bracket(5) Screw used to attach front mounting brackets to the switchNOTE:The switch provides three positions to mount a load-bearing screw on both sides. Select a properposition according to the actual requirements. The rear mounting brackets tightly contacted with theload-bearing screws can support the switch.5. Select a position to install the switch and attach the rear mounting brackets to the rear posts withscrews and cage nuts, as shown in Figure 7.