241.Selection of Installation Place(1) Place above the ceiling where have enough space to arrange the unit.(2) Place where the drainage pipe can be arranged well.(3) Place where inlet and outlet air of indoor and outdoor unit will not be blocked.(4) Do not expose the unit to the place with heavy oil or moisture (e.g.kitchen and workshop).(5) Do not set the unit in the place where destructive gas (such as sulfuric acid gas) or pungentgas (thinner and gasoline) concentrates and retains.(6) Place strong enough to support the unit weight.(7) No expensive articles such as television and piano below indoor unit.(8) Enough space for maintenance.(9) Place more than 1m away from television and radio to avoid disturbing television and radio.(10) Easy for maintenance.2.Installation Preparation(1) Position of ceiling opening between unit and suspending bolt (front view of unit).(2) Prepare all piping (refrigerant,water drainage )and wires (connection wire of remote controller,indoor unit connection wires) to the indoor unit before installation in order to connect indoor unitimmediately after installation.Overlap between ceiling andornament panel shall be 25mmSuspending boltsCeiling Ornament panel150mm320mm60mmDistance betweensuspending bolts 535mmIndoor unit 570mmCeiling opening 650mmOrnament panel 700mmIndoor unit 570mmCeiling opening 650mmOrnament panel 700mmAir outlet Air outletAir inlet2.5m Over1.5m 1.5m 0.31mHInstallation Procedudres