6. Pull the two blue latches (1) on the power-supply structure toward the front ofthe server; the structure will disengage from the chassis.7. Grasp the handle in the middle of the structure and rotate the structure up (2),allowing the structure to pivot at the chassis front.8. Lift the structure out of the server, and make sure that the alignment tabs clearthe chassis.To install a power-supply structure, complete the following steps.Attention: Do not allow any cables to be pinched or caught on metal protrusions.1. Align the tabs on the power-supply structure with the notches on the rear of thechassis; then, gently lower the structure into the server. Make sure that thestructure is firmly seated in the chassis.2. Push the two blue latches of the power-supply structure toward the rear of theserver until they lock the structure into position.3. Replace the power supplies.4. Replace the memory cards.5. Replace the top cover.6. Reconnect the external cables and power cords.SAS backplaneTo remove the Serial Attached SCSI (SAS) backplane, complete the following steps.Release tabsGuide channelsSAS connectors1. Read the safety information that begins on page vii, and “Handlingstatic-sensitive devices” on page 100.2. Turn off the server and peripheral devices, and disconnect the power cords andall external cables necessary to replace the device.3. Remove the top cover.4. Pull the hard disk drives out of the server slightly to disengage them from theSAS backplane.122 IBM xSeries 366 Type 8863: Problem Determination and Service Guide