7. Place the cable-management arm (D) on the support arm (A). Slide the first cable-management armtab into the slot on the mounting bracket (C). Push the tab until the spring-loaded latch snaps intoplace. Slide the other cable-management arm tab into the extension bracket (E) on the outside of theright slide rail (2). Push the tab until the spring-loaded latch snaps into place. For details, seeFigure 15.Cabling the server and setting up a consoleYour console, monitor, or interface choices are guided by whether you create logical partitions, whichoperating system you install in your primary partition, and whether you install a Virtual I/O Server(VIOS) in one of your logical partitions.Determining which console to use:Your console, monitor, or interface choices are guided by whether you create logical partitions, whichoperating system you install in your primary partition, and whether you install a Virtual I/O Server(VIOS) in one of your logical partitions.Choose one of the consoles, interfaces, or terminals in the following table.Figure 14. Installing the mounting bracket into the slide railFigure 15. Connecting the cable-management arm10 Power Systems: Installing the IBM Power System S822 (8284-22A)