a. Select the console, and press Enter.b. Select a language for the BOS menus, and press Enter.c. Select Start Install Now with Default Settings.d. Select Continue with Install. The managed system restarts after the installation is complete, andthe login prompt is displayed on the ASCII terminal.6. After you install the IVM, finish the installation by accepting the license agreement, checking forupdates, and configuring the TCP/IP connection.7. Continue with “Routing cables through the cable-management arm and connecting expansion units.”Cabling the server with keyboard, video, and mouse:Before you start the system, you might need to connect the keyboard, video, and mouse (KVM) to thesystem, if a graphics card is present.To connect the KVM, complete the following steps:1. Locate the graphics card and USB ports at the rear of the system. You might need a connectorconverter.2. Connect the monitor cable to the graphics card.3. Connect a keyboard and mouse to the USB ports.4. Power on the console.5. Continue with “Cabling the server and connecting expansion units” on page 19.Routing cables through the cable-management arm and connecting expansionunitsUse this procedure to route cables through the cable-management arm and to connect expansion units.To route cables through the cable-management arm and to connect expansion units, complete thefollowing steps:1. Route the console cable through the cable management arm.2. Connect expansion units that were shipped with the system. For more information, see the expansionunit installation book that was shipped with the system. Complete the tasks associated withconnecting a preinstalled expansion unit or disk drive enclosure, then return to this document tocomplete your server setup.3. Continue with “Completing the server setup.”Completing the server setupLearn about the tasks you must complete to set up your managed system.Select from the following options:v “Completing the server setup by using an HMC”v “Completing the server setup without using a management console” on page 30Completing the server setup by using an HMC:Perform these tasks to complete the server setup by using a Hardware Management Console (HMC). Youcan also begin to use virtualization to consolidate multiple workloads onto fewer systems to increaseserver use, and to reduce cost.To manage POWER8 processor-based systems, the HMC must be at version 8 release 8.1.0, or later.To complete the server setup by using an HMC, complete the following steps:28 Power Systems: Installing the IBM Power System S822 (8284-22A)