INSTALLATIONmini HE --- Installation & Servicing1814 WALL MOUNTING TEMPLATE(side flue)IMPORTANTDetailed installation steps are given directly on the wallmounting template1 Tape the template into the selected position.2 Ensure squareness by hanging a plumbine.3 Mark onto the wall the following:a. the wall mounting plate screw positionb. Extended the centre line as shown.Mark the flue ductcentre from the corner (see diagramand template)Note. mark the centre of the hole as well as thecircumference.If extension duct kit pack D has to be used, the pipes musthave the correct slope as detailed in frame 11.4 Remove the template from the wallExtended centreSpirit level15 DRILLING THE WALLRear flue shownIMPORTANTEnsure that, during the cutting operation, masonry fallingoutside the building does not cause damage or personalinjury.1 Cut the flue hole (preferably with a 5” core boring tool),ensuring that the hole is square to the wall.2 Drill the fixing holes with an 8mm (5/16”) masonry drill.Fit suitable wall plugs (not provided).Note. If the teminal is to be sited within 25 ---40 mm of acorner or vertical pipe (refer to Table 4) then the hole MUSTbe accurately cut and the rubber weather seal trimmed.5” diameterflue holeSectionthrough wallNote: Check all of the holepositions before drilling.16 FITTING THE WALLMOUNTING PLATERefer to frame 18 for service connections.Fit the wall mounting plateDirectly to the wallF Offer up wall mounting plate.F Screw through the fixing holes using 3 off no. 14x2”screws (not provided).F Check alignment with spirit level.F Tighten screws.INSTALLATION