3- 4 Keysight N5290/1A Installation GuideSystem InstallationReceiving the System3-Receiving the SystemReceiving the SystemThe N5290/1A system components will arrive packaged separately. For acomplete list of components shipped with your system, refer to Table 2-3 onpage 2-8 through Table 2-4 on page 2-9.When the entire shipment has arrived, contact Keysight Technologies toarrange for system installation. See “Keysight Support, Services, andAssistance” on page 4-4.Keep the shipping containers until the system checklist has been completed,and the system has been checked for physical damage.If the shipping container is damaged or the packaging material shows signs ofstress, notify the carrier as well as Keysight Technologies. Keep the shippingmaterials for the carrier’s inspection. Keysight Technologies will arrange forrepair or replacement of damaged equipment without waiting for a claimsettlement from the carrier. Refer to “Keysight Support, Services, andAssistance” on page 4-4.Keysight Technologies Customer EngineeringA Keysight Technologies Customer Engineer will be assigned to help you installthe system. During installation, the Customer Engineer will do the following:— Unpack the system components.— Verify the system parts list, see Table 2-3 on page 2-8 or Table 2-4 onpage 2-9.— Initialize the PNA as described in E8356-90001 Quick Start Guide thatcomes with every PNA.— Run the Operator’s Check of the PNA as described in the E8356-90001Quick Start Guide that comes with every PNA.— Connect the N5292A millimeter head controller to the PNA. Install theN5293A or N5295A millimeter-wave frequency extender test head modules.— Run the Operator’s Check of the system using the procedure in Chapter 4,“Performance Verification.”— Run the System Verification as described in Chapter 4, “PerformanceVerification.”— Provide training for one user.The N5292A millimeter head controller and the test head modules aresensitive to electrostatic discharge (ESD). Ground your work station beforeunpacking and installing the test head modules. See “ElectrostaticDischarge Protection” on page 1-7.