30SEG Operating Instructions4 Technical data4.7 Installation location and installationpositionThe following requirements with regard to the installationlocation and the installation position must be met (seeSection 5.2.2: „Substructure, installation location and in-stallation position", page 32):• The pull-rope emergency stop switch must bemounted so it is centered between the attachmentpoints on the pull rope.• Trigger lever (1) must be pointing at the conveyorbelt.• If the device is positioned transversely, screwedcable gland (11) must point downwards. To do this itmay be necessary to replace the dummy plug (10)and the screwed cable gland (11).Fig. 4-5: Installation positionαhorizontal α: up to approx. 15°1111111010