42SEG Operating Instructions5 Mounting and dismounting5.5.2 Detaching the electrical connections1. Remove the screwed cable gland nut (11).2. Remove the cable in the pull-rope emergency stopswitch from fastening clamp (14) and remove thecable tie if applicable (see Fig. 5-6).Note!To mount a new pull-rope emergency stopswitch or a repaired pull-rope emergency stopswitch, we recommend that the connections belabeled with the connection designations for thepull-rope emergency stop switch before theconnection cables are disconnected.3. Disconnect the connection cable between the safetyand control circuits and the switching elements (5, 6)and if applicable, disconnect the connection cablefor the signal lamp (12) as described in Section 4.2:„Electrical connection“, page 24 (see Fig. 5-6).4. Disconnect the protective conductor on the protec-tive conductor connection M4 (8).5. Remove the cable from screwed cable gland (11).Fig. 5-6: Electrical connectionsX1 X213 1433 3453 5421 2241 4261 62X1 X2126 (N/O contact,control circuit)5 (N/C contact,safety circuit)12Pull rope side 14128