SecureLinx SLP Remote Power Manager 92: InstallationPrior to installation, refer to the following lists to ensure that you have all the itemsshipped with the unit as well as all other items required for proper installation.Standard Accessories Mounting bracket hardware:Vertical (SLP-V models) – two removable flanges with four M4 screws and twomounting L-brackets with two nut plates and four sets of screws and washersHorizontal/Rack (SLP-H models) – two mounting brackets and four screws RJ45 to RJ45 serial rollover cable RJ45 to DB9F serial port adapter (for connection to standard DB9M DTE serialport) Outlet retention clips, one per outlet (208-240V units only) Power input retention bracket hardwareTwo removable T-brackets with two 40mm screws Additional required Items:Phillip screwdriverScrews, washers and nuts to attach the SLP to your rackPower input cord (purchased separately)Equipment OverviewThe outlets are labeled 1 through 16. These numbers may be used in commands thatrequire an outlet name. See Outlet Naming and Grouping for more information. Thepower inlet connects to the electrical power source. Figure 2-1 shows the hardwarefeatures of the SLP.Note: Models SLP-H8 and SLP-V16 are displayed in the followingillustration. Other models may have variations.