System Preparation and ConfigurationDS2000 Hardware Manual Section 1: Installing the Cabinet 1-11Section 1: Installingthe CabinetSystem Preparation and ConfigurationSystem Preparation and ConfigurationUnpackingUnpack the equipment and check it against your equipment lists. Inspect for physical damage. If you are notsure about a component’s function, review the Product Description Manual. Contact your Sales Representa-tive if you have additional questions.Have the appropriate tools for the job on hand, including: a test set, a punch down tool and a digital voltmeter.Before InstallingMake sure you have a building plan showing the location of the common equipment, extensions, the telcodemarcation and earth ground. In addition, the installation site must meet the requirements outlined in theStandard Practices Manual.Site RequirementsThe common equipment is contained in the wall-mounted Main Equipment Cabinet. Choose a central locationfor the cabinet that allows enough space for the equipment — and provides enough room for you to comfortablywork. Figure 1-1 4 Slot Cabinet Installation Layout on page 1-8 and Figure 1-2 8 Slot Cabinet InstallationLayout on page 1-9 show you about how much space your system requires.