Technical Product Manual - DCT1900Installation Instructions, General2-2 Install-DCT1900/R8/mw© 2000-2005z equipment to measure the delay times of Base Station cables and external synchronizationcables-TDRz Siemens 66 blockz punch down tool2.5 Equipment VerificationObtain a copy of the order that was placed for the system and verify the order against the shippingforms found on the boxes containing all the DCT1900 equipment.2.6 Miscellaneous ItemsCheck that the following additional items are available:z Base Station cables (see Chapter 16, Paragraph 16.2)z RJ45 plugs and crimper for Base Stationsz Material for external sync cables as specified in Chapter 18, Paragraph 18.2 if PWT airinterface synchronization is required in a multi DCT1900 system environment.z IBM compatible personal computer as specified in Installer’s Quick Guide (CSMW)z Epson compatible printer (optional)z #10-12 gauge wire to connect the Modular Cabinet to protective ground.2.7 Switch RoomVerify that there is an adequate wall space to mount the equipment. Verify the locations andavailability of adequate power and earth ground.