Technical Product Manual - DCT1900Installation Instructions, Modular Cabinet – Installation StepsInstall-DCT1900/R8/mw 3-3© 2000-200515. Initialize the DCT1900 system. See "CSM Installer’s Quick Guide (Appendix I)16. Place the securing bar. See Paragraph 4.1217. Place the cabinet number labels, board namelabels and cable position labels. See Paragraph 3.8 & 3.9.18. Commissioning. See Section 6, "Commissioning"3.4 UnpackingThe system is delivered in several cardboard boxes. To unpack, do the following:1. Read ESD instructions in Section 1 "Safety and Regulatory Information".2. Open the cardboard boxes and take out the shipping list.3. Check the contents of the boxes with the shipping list .4. Report any discrepancies or damages to cabinet(s) or board(s).3.5 Charging Portable Telephone BatteriesAfter installation the system must be tested with the Portable Telephones. Charge the batteriesprior to installation to avoid flat batteries. Charging the batteries completely takes some timedepending on the type of the charger. Refer to the DT600 Portable User Guide - LZB 119 2665,DT620 Portable User Guide - LZT 123 3105 or 9p23 User Guide - AWS1090 for battery charginginstructions.3.6 Switching On/OffNote:Simultaneous switching on of cabinets will result in erroneous system start–up.Multi Cabinet Configurationz Power on: first switch on all cabinets except cabinet 1 and then switch on cabinet 1.z Power off: first switch off cabinet 1 and then switch off the other cabinets.Base Stations Powered via PW-EXTBase Stations can be switched on prior to the cabinet or vice-versa.PrinterWhen the RE is reset or switched on, always press the on–line button of the printer at least twiceso that the printer is on–line. The RE will only detect a printer if a change from on–line to off–linestate is received.3.7 LabelsWith each cabinet, a label sheet is delivered containing labels of all system board names, cabinetnumbers, board positions and cable positions.3.8 Board Position LabelThe board position label can be placed on the leading edge of the shelf below the system boardsas indicated in Figure 3–2. The label should be placed before installing the cabling.