4 Specifying settings from the control panel4-132 CS230 (Phase3)Schedule settingYou can specify the schedule for sending the total counter. An example forspecifying "Schedule1" is described below.The settings that can be specified are described below.When "Daily" is specified as the notification periodWhen "Weekly" is specified as the notification periodItem DescriptionInterval of Day(s) Enter the days each month for sending the schedule. Tochange the value, press the [C] (clear) key, and then use thekeypad to type in the value (between 1 and 31).Item DescriptionInterval of Week(s) Enter the interval of weeks for sending the schedule. Tochange the value, press the [C] (clear) key, and then use thekeypad to type in the value (between 1 and 6).Day of the Week Select the day of the week for sending the schedule.