Configuration Setup© PAT Revision E // SB // 09/03/02 190137_E114 CONFIGURATION SETUPThe LMI setup procedure allows the operator to input the crane configuration usinginteractive displays. The operator must complete the setup procedure for the LoadMoment Indicator system if the system has been turned off for more than two hours or thecrane operation configuration has been changed.4.1 LMI Setup Procedure...starts: automatically, if the system wasturned off for more than twohours.manually at each modification ofthe crane configuration bypressing key (9) "SEL"...is operated: by answering the differentquestions using functional keysF1...F4 matching the actualconfiguration of the crane....is cancelled: any time by pressing again key(9) "SEL". The system, however,is only ready for operation, if theprocedure has been completedand the inputs have beenconfirmed.If the system is turned off less than 2 hours (during short breaks), all adjustments remainstored. When turning the system on again, these adjustments can be acknowledged bymerely pressing the “OK” function key if the crane configuration has not been modified.Note during low temperatures the LC display will not show the graphics, or becomeoperational, until the console heater has warmed the electronics.For extended travel on tire without load, Press the “SEL” button to silence the alarm.NOTE: When the “SEL” button is pressed and no operating configuration is selected, theboom down and tele out functions are locked out because the LMI is not in operation.