MEWNET-W4-24.1 OverviewThe following are main steps to use the FP7 MW Unit in W mode.Item Used tool Outline of operation① Set the switches ofthe unit. -Select "W mode" by the mode selector switches. Set whether touse PLC link or not.Specify unit number. When setting it in the configuration of toolsoftware or user program, set it to "00".② Registration in I/Omap of the unit FPWIN GR7Register the unit configuration of the FP7 system on the “I/Omap” dialog box.Confirm slot numbers specified for each instruction.When using the data transfer function, confirm the number ofthe flag to be checked when executing SEND/RECVinstructions.③ Unit Configuration FPWIN GR7Specify unit number. (When selecting "00" by the unit numberselector of the unit.) (Note 1)Allocate link relays and link registers used for the PLC link.(Note 2)Set a device in which the communication state (transmissionassurance relay, operation mode relay) is copied.④Download thesettings to the unitand confirm theoperation state.FPWIN GR7Download “I/O map” and "unit configuration" information to theFP7 CPU Unit.Switch the mode to RUN mode.Confirm the state if the process is normally performed. Thecommunication state and error information can be confirmedby the communication state information copy destinationdevice, system relays or system data registers. Also, detailedinformation can be read by PMGET instruction.(Note 1): The unit number can be set by a user program.(Note 2): For MEWNET-W, link relays and link registers can be allocated by user programs.