Contents - Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- about this guide
- reference documents
- DTE Drop/Insert (DSX-1) Interface
- SNMP Management Support
- Standalone DSU/CSU Rear Panel
- application examples
- Installing the +24 Vdc Power Supply
- Installing the Single – 48 Vdc Power Supply
- Installing the Redundant – 48 Vdc Power Supply
- cabling examples
- using the front panel
- Keypad
- Test Jacks
- LEDs
- displaying unit identity
- setting customer identification
- displaying led conditions
- changing configuration options
- Displaying/Editing Configuration Options
- Saving Edit Changes
- Selecting/Copying to a Specific Port
- Selecting the Port
- Setting the IP Address
- Selecting the Link Layer Protocol
- Specifying the Community Name(s) and Access Type(s)
- Enabling SNMP Trap Messages
- Selecting the Number of Trap Managers
- Configuring a Destination for SNMP Traps
- configuring ds0 channels
- Displaying DS0 Channel Assignments
- Allocating Data Ports
- Block or ACAMI Assignment Method
- Individual Channel Assignment Method
- Allocating DS0 Channels from the DTE Drop/Insert Interface to the Network Interface
- Clearing DS0 Channel Allocation
- providing backup capability
- Configuring for Network Timing
- establishing access security on a port
- setting a password
- entering a password to gain access
- Acquiring the Active User Interface
- Releasing the Active User Interface
- Entering Numbers in the Phone Directories
- Initiating a Call for Front Panel Pass-Through Operation
- Initiating a Call for PC, ASCII Terminal/Printer, or SNMP Operation
- Disconnecting the Modem Connection
- download operations
- Changing User Interface Access Security
- device health and status
- performance reports
- H Alarms
- snmp traps
- troubleshooting
- test jacks
- test commands
- Sending a Line Loopback Up or Down
- Sending a V.54/ANSI FT1 Activation/Deactivation
- local loopback tests
- Starting a Line Loopback
- Starting a Payload Loopback
- Starting a DTE Loopback
- Starting a Repeater Loopback
- Starting a Data Channel Loopback
- Starting a Data Terminal Loopback
- Aborting Loopbacks
- test patterns
- Sending Test Patterns
- Monitoring Test Patterns
- Aborting Test Patterns
- Starting a Lamp Test
- Aborting a Lamp Test
- technical specifications
- H DTE Interface Configuration Options
- H Management Configuration Options
- network interface configuration options
- general configuration options
- configuration worksheets
- pin assignments
- aux port interface
- com port interface
- power input connector
- external clock interface
- System Group, MIB II
- Interface Group, MIB II
- IP Group, MIB II
- ICMP Group, MIB II
- SNMP Group, MIB II
- Far End Group, DS1/E1 MIB
- DS1 Fractional Group, DS1/E1 MIB
- General Port Table, RS-232-like MIB
- Asynchronous Port Table, RS-232-like MIB
- Synchronous Port Table, RS-232-like MIB
- Output Signal Table, RS-232-like MIB
- Generic Interface Test Table, Generic Interface MIB
- front panel emulation
- starting front panel emulation
- before using the asynchronous terminal
- initiating an asynchronous terminal session
- ending an asynchronous terminal session
- menu organization
- using asynchronous terminal screens
- Displaying or Editing Configuration Options
- configuration worksheets for the asynchronous terminal interface
- equipment list
|
i3160-A2-GB21-80 March 1999ContentsAbout This Guide Document Purpose and Intended Audience vii. . . . . . . . . . . . . . . . . . . . . . . . . Document Summary vii. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Product-Related Documents viii. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Reference Documents ix. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 Introduction Overview 1-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Features 1-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .DTE Drop/Insert (DSX-1) Interface 1-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . .Alarm Message Capability 1-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Front Panel Emulation 1-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Integral Modem 1-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Async Terminal Interface Support 1-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Telnet Access 1-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .SNMP Management Support 1-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Physical Description 1-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Standalone DSU/CSU Front Panel 1-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . .Standalone DSU/CSU Rear Panel 1-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 Installation Overview 2-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Application Examples 2-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SNMP or Telnet Connection Examples 2-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . Important Instructions 2-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Optional Power Sources 2-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Installing the +24 Vdc Power Supply 2-5. . . . . . . . . . . . . . . . . . . . . . . . . . .Installing the Single –48 Vdc Power Supply 2-6. . . . . . . . . . . . . . . . . . . . .Installing the Redundant –48 Vdc Power Supply 2-7. . . . . . . . . . . . . . . . . Cabling Examples 2-8. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Power-Up Self-Test 2-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PreviousNext |