5–Validation Methods for DCB and FCoEValidation Step 3—FCoE Function and I/O Tests5-12 51031-00 AValidation Step 3—FCoE Function and I/O TestsFigure 5-12 shows the three test configurations that validate FCoE function andI/O in the FCoE fabric: Converged Network Adapter host > FCoE switch > FCoE storage Converged Network Adapter host > FCoE switch > direct-attached FibreChannel storage Converged Network Adapter host > FCoE switch > Fibre Channel switch >Fibre Channel storageFigure 5-12. I/O Test with Fibre Channel SAN Storage SetupValidation ProcessThe following validation steps are used for all three test configurations:1. Install the Medusa test tools (MLTT) on the Converged Network Adapterhost.2. Map the target device from the MLTT client interface.Converged Network Adapter Host > FCoE Switch > FCoE StorageConverged Network Adapter Host > FCoE Switch > Direct Attached Fibre Channel StorageConverged Network Adapter Host > Fibre Channel Switch > Fibre Channel Storage4Gbps10Gbps