Chapter 2 Installation and Setup WinLink1000 Installation and Operation Manual ODU Mast/Wall mounting kit plus mounting instructions WinLink1000 Manager installation CD Spare RJ-45 connector• IDU package contains: IDU 110V/220V adapter IDU wall-mounting drilling template Self adhesive label showing the IDU LED operation Spare RJ-45 connectorOr• IDU-E Package Contains: IDU-E Self adhesive label showing the MAC address and the alternativecommunity string KEY. Keep this label safe. For AC model, 110/240 VAC with 3-pin terminal block connector(green) For DC model, 3-prong connector cable Standard 1-U, 19” carrier rack Spare RJ-45 connector• External antenna (if ordered)• ODU/IDU cable at length ordered (optional)• Technical documentation CD2.4 Equipment RequiredThe following is a list of the equipment required for installing theWinLink1000 hardware.• RJ-45 crimp tool (if pre-assembled ODU/IDU cable is not used)• Drill (for wall mounting only)• IDU and ODU grounding cable• 13 mm (1/2″) spanner wrench• ODU to IDU cable if not ordered (Outdoor class, CAT-5e, 4 twistedpairs)2-2 Equipment Required 9/18/2006 2:26:00 PM