Installing WinLink 1000 Units 1Quick Start GuideInstallation of WinLink 1000 should be carried out only by a qualifiedtechnician. If you are familiar with WinLink 1000, use this guide toprepare the units for operation.1. Installing WinLink 1000 UnitsODU Package Contents:• ODU• Mast/Wall mounting kit• WinLink 1000 Management software installation CD• Mounting instructions• Spare RJ-45 connector• ODU to IDU cable at length ordered (optional)IDU-E Package Contents:• IDU-E• 110V/240V adaptor• IDU wall-mounting drilling template• Spare RJ-45 connector(Optional) IDU-C or AIND Package Contents:• IDU-C or AIND• For IDU-C AC model, 110v/240 VAC with 3-prong connector cable• For DC model, -48 VDC with 3-pin terminal block connector (green)• IDU standard 1-U, 19” carrier rack• Spare RJ-45 connectorEquipment Required:• RJ-45 crimp tool (If pre-assembled cable is not used)