20 Ec ControllerManually Run a ProgramDIAGRAM 241. Turn the programming dial to MANUAL CYCLE.2. Program A appears in the display.3. To choose another program, press the PROGRAM button(ABC) until the desired program letter appears in thedisplay.4. Press ENTER to start the selected program.NOTES: You can stack two or three programs tooperate manually by pressing ENTER afterselecting each program.The controller runs stacked programs in order (A,then B, then C), no matter in which order you stackthem. For example, if you start program B, thenstack program C, then program A, the controllerwill finish B, and then run A, and finally C.5. Turn the programming dial back to AUTO. The letter of themanually operating program (A, B, or C) appears in thedisplay. Any stacked programs flash until their turn torun.NOTE: Water budgeting does apply to manuallyoperated programs.After the last manual program runs, the controller returns toAUTO mode and awaits the next scheduled program start time.NOTES: Manually operating a station does notaffect the stations run time(s) in the automaticprograms (A, B, or C).Manual operation cancels the operation of anyautomatic program in progress. Also, WaterBudgeting does not affect manually operatedstations.Run a Test ProgramDIAGRAM 25The controllers built-in test program will run each station thathas a non-zero watering time. When you run the test program,the controller operates each station in numerical sequence,from lowest to highest. You can use this feature to check theoperation of all sprinklers in the system.1. To test all controller stations, turn the programming dial toTEST.