4Manual No. 016-0230-005 43UltraGlide1. Locate the left and right ultrasonic sensors (P/N 063-0130-012 and 063-0130-014) in the AutoBoominstallation kit.2. Remove the sensor from the existing plastic arm.3. Install the sensors on the 12” S-type sensor arms (P/N 063-0131-592) using the supplied 5/16”-18 x 1-1/4”bolts (P/N 311-0052-106), 5/16”-18 nylon insert lock nuts (P/N 312-4000-059) and 5/16” zinc flat washers(P/N 313-2300-012).4. Mount the left sensor to the outer-end of the center rail of the left boom using two 2-1/16” W x 3” L x 3/8”thread U-bolts (P/N 107-0171-609) and four 3/8”-16 zinc flanged lock nuts (P/N 312-1001-164).5. Tighten the nuts to ensure the sensor is mounted securely.6. Repeat the steps above to mount the remaining boom sensor(s).Mount the Center Rack SensorFIGURE 11. Center Sensor Mounting Location1. Mount the center sensor (P/N 063-0130-018) to the machine’s center rack using two 2-1/16” W x 3” L x 3/8”thread U-bolts (P/N 107-0171-609) and four 3/8” zinc flanged lock nuts (P/N 312-1001-164).Connect the Sensor Cables1. Connect the left sensor cable (P/N 115-0171-527) to the connector on the left sensor.2. Route the left sensor cable to the AutoBoom valve.3. Loop and tie-off any excess cable, while allowing enough cable for boom folding and extension.4. Repeat the steps above to connect the remaining boom sensor cables.Note: The sensor cables will be connected to the AutoBoom system in the wiring phase of installation.