10 | U32-10 Regency ® Direct Vent Gas Insert|10installationVENTINGTHE APPLIANCE MUST NOT BECONNECTED TO ACHIMNEY FLUE SERVING ASEPARATE SOLID FUELBURNING APPLIANCE.This appliance is designed to be attached totwo 3" (76mm) co-linear aluminium flex runningthe full length of the chimney. The flue lengthmust be a minimum length of 8 ' (2.44m) anda maximum of 35' (10.7m). See chart below forminimum distances from roof. Periodically checkthat the vent is unrestricted.Masonry chimneys may take various contourswhich the flexible liner will accommodate.However, keep the flexible liner as straight aspossible, avoid unnecessary bending.The Air Intake pipe must be attached to the inletair collar of the termination cap.Part # Description948-305 3" Flex - 35 ft.946-529 Co-linear DV VerticalTermination CapGAS CONNECTIONGAS CONNECTION WARNING:Only persons licensed to workwith gas piping may make thenecessary gas connectionsto this appliance.1) If the appliance is to be installed into anexisting chimney system, thoroughly cleanthe masonry or factory built fireplace.2) The appliance is provided with an opening onthe left hand side of the control compartment.A 3/8" NPT gas supply pipe must be broughtnear this inlet hole.3) Locate the center point where the ventwill pass through the chimney above theappliance. Move the appliance into theexact location where it is to be installed.Ensure that the Insert is level.Diagram 3Note: A noncombustible mantel may beinstalled at a lower height if theframing is made of metal studscovered with a noncombustibleboard.FLUE LINERINSTALLATION1) Cut the flex liner as required.2) Mark the end of one liner to indicate Inlet.3) Connect the other end of the above liner tothe inlet side of the termination adaptor, sealconnection with high temperature silicone.Secure with gear clamp.4) Connect the 2nd liner to the exhaust sideof the adaptor, seal connection with hightemperature silicone. Secure with gearclamp.5) Install flashing.CLGasInlet6) Insert both liners into chimney, passingthrough the damper opening.7) Install termination cap.8) Connect the marked end of the liner tothe inlet collar of the vent connector platemarked with an "I", seal connection withhigh temperature silicone. Secure with gearclamp.The Air Intake pipe must be attached to theinlet air collar of the termination cap.Alternate Approved Caps46dva-VC Vertical Termination Cap46dva-VCH High Wind Cap46dva-GK 3" Co-linear Adaptor with flashingIn areas of consistently high winds, werecommend using the Simpson Dura-VentSystem (46dva-GK adapter and 46dva-VCHhigh-wind cap).The Air Intake pipe must be attached to the inletair collar of the termination cap.Install the rear air deflector to the back wall of thefirebox using 2 existing lower 1/4" screws.Air DeflectorImportant:Air Deflector(Part #420-119) isrequired for allLP installations.For Natural Gasinstallations -theair deflectoris required whenventing is a mini-mum of 15ftto a maximum of35ft.Not required onNG if venting isbetween8ft. to 14.99ft