Part 1: Site Survey and Overview of DECT Systems8DECT Survey Report FormNumber: Date:From : [Survey Engineer]To : [Customer Installation Engineer]1. SITE[full address of site]2. Survey Engineers[name and addresses of engineer(s) who executed the survey]3. Outline description of site[short description of site (dimensions, environment, number and type ofbuildings, etc)]4. Number of handsets and expected traffic[description of expected traffic and indication of above- or below-average traffic areas]5. Test results[this should include the site maps and any additional information thatmay be useful]6. Connections to Base Stations[list of planned Base Stations with approximate cable length andtype, and whether existing wiring can be used or new cabling is re-quired]7. Type and location of keyphone system[description, location and system configuration]8. Existing cabling[indicate what cabling is available and how it is distributed across thesite]9. Base Station installation[for each Base Station, indicate exactly where it can be installed, e.g.“in the corridor against the wall of room 32, 2.5m high” and wherecustomer restrictions apply as to where Base Stations may be in-stalled]10. Possible configurations[list alternative configurations for the deployment of Base Stations—refer to coverage maps and indicate areas where coverage cannotbe guaranteed]