1IntroductionThis guide describes the procedures required for installing the Samsung DECT 500and 1500 systems with Base Stations, Repeaters and handsets. Before installing thehardware, a careful site survey must be carried out to determine the exact require-ments of the site and the optimum locations for installing equipment.The site survey and installation phase starts by surveying the site with the Site Sur-vey kit and marking your findings on a plan of the site; it ends when the system hasbeen running for one or two weeks.The procedure for the site survey and installation phase is summarised below.1. Site survey by an accredited DECT engineer.2. Install the Base Stations (and Repeaters if required) for optimum coverage.3. Evaluate the site survey. If necessary, install additional Base Stations / Re-peaters, or move existing Base Stations / Repeaters.4. Register handsets.Part 1 describes the site survey and provides a detailed overview of the variouscomponents of your DECT system, including how Base Stations and Repeatersshould be positioned to provide optimum performance.Part 2 provides information on procedures to install and configure the hardwarecomponents for each system (CCFP, Base Stations, handsets etc.) and how to installRepeaters.Installation and configuration of the DECT 1500 system requires the use of the sup-plied administration program running on a PC connected to the system. This is op-tional for a DECT 500 system.Some TerminologyThroughout this guide, you will find the following terms used:CCFP=Central Control Fixed Part (the system “central processing unit”)RFP=Radio Fixed Parts (Base Stations)WRFP=Wireless Radio Fixed Parts (Repeaters)PP=Portable Parts (handsets)Important: The DECT system is not intended to be a cordless PABX solution. Itis provided as an “add-on” to enhance the current range of Samsung PABXs.