226.8 COMMISSIONINGNOTICEImpurities in the spraying system!Spray gun blockage.Flush the spray gun and paint supply with a suitable flushing agent beforecommissioning.6.8.1 PROCEDURE1. Secure the spray gun.B_02261x2. Connect the product hose to the spray gun and product supply system.3. Connect air hose to spray gun and to oil-free, dry air supply.4. For spray guns with filters, insert a suitable filter (filter insert, see Chapter 13.6).5. Fit nozzle on nozzle seal. Fit air cap over nozzle.Note the flattened parts (X) on the nozzle and in the air cap.Fit the union nut with nozzle guard and tighten by hand.6. Visually check the permissible pressures for all the system components.7. Make sure that the device and all other conductive parts within the work area aregrounded.8. Set operating pressure at 100 bar; 10 MPa; 1450 psi and use a suitable medium tocheck that connections do not leak.Note:Pull the trigger and check whether the spray gun closes cleanly upon release.9. Relieve the pressure of the spray gun and device and secure the spray gun.6.8.2 VERIFYING A SAFE OPERATIONAL CONDITIONA skilled person must check to ensure that the device is in a reliable state after it isinstalled and commissioned.This includes:– Carry out safety checks in accordance with Chapter 8.2.3.VERSION 06/2018 ORDER NUMBER DOC2311730