72GM 5000EAOPERATING MANUALEDITION 04/2016 ORDER NUMBER DOC234449911 FUNCTION TEST AFTER THE REPAIRAfter all repairs, the device must be checked for safe condition before recommissioning.The necessary scope of inspection and testing depends on the repair carried out and mustbe documented by the repair staff.11.1 CHECKING THE HIGH VOLTAGENecessary test equipment:VM 500 or VM 5000 control unit and HV200 high-voltage tester.High-voltage measurement on spraying gun.Connect gun cable to control unit. Take the spray gun in your hand and hold it in openspace. Switch on control unit and actuate trigger guard.The high voltage should be 60 to 65 kV in dry ambient air. The value can be checked withthe display on the control unit (VM 5000).Note:The gun must be clean and dry and must not have any paint or cleaning agent residues.In the case of ambient air with a high air humidity, the measured value can reduce to 50to 55 kV.High-voltage measurement with high-voltage testerPlace the ball of the high-voltage tester on the gun electrode and turn on the high voltage.The measured value should be 70 to 80 kV.Notes- When measuring the high voltage the gun and the measuring device should be held atarms length as far from the body as possible.- There should be no chargeable objects within a radius of 1 m; 3.28 ft of the placewhere the measurements are taken.- The placing of the measuring ball of the high-voltage measuring device reduces thespraying of the high-voltage electrode. As a result the high-voltage value increasescompared to the spraying in the free space.