30 Assembly WAGO-I/O-SYSTEM 750 XTR750-xxxx/0040-xxxx Design Notes /XTRManualVersion 1.2.05.6.3 Inserting the I/O Module1. Position the I/O module so that the tongue and groove joints to the fieldbuscoupler/controller or to the previous or possibly subsequent I/O module areengaged.Figure 6: Insert I/O Module (Example)2. Press the I/O module into the assembly until the I/O module snaps into thecarrier rail.Figure 7: Snap the I/O Module into Place (Example)With the I/O module snapped in place, the electrical connections for the datacontacts and power jumper contacts (if any) to the fieldbus coupler/controller or tothe previous or possibly subsequent I/O module are established.Pos : 26.21 /D okumentati on allgemei n/Gli ederungsel emente/---Seitenwec hs el--- @ 3\mod_1221108045078_0.doc x @ 21810 @ @ 1