ABB ACS350 Series manuals
ACS350 Series
Table of contents
ACS350 Series
Table of contents
- ACS350 drive manuals
- What this chapter contains
- Installation and maintenance work
- Operation and start-up
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table of contents
- Installation and commissioning flowchart
- Overview: Connections
- Type code
- Delivery check
- Mounting the drive
- Fasten clamping plates
- Thermal overload and short-circuit protection
- Protection against short-circuit in the motor and motor cable
- Selecting the power cables
- Motor cable shield
- Protecting the relay output contact and attenuating disturbances in case of inductive loads
- Relay cable
- Control cable ducts
- Connecting the power cables
- Procedure
- Connecting the control cables
- Checklist
- How to perform the limited start-up
- How to perform the guided start-up
- How to control the drive through the I/O interface
- How to perform the ID Run
- Basic Control Panel
- Operation
- Output mode
- Reference mode
- Parameter mode
- Copy mode
- Basic Control Panel alarm codes
- Assistant Control Panel
- Parameters mode
- Assistants mode
- Changed Parameters mode
- Fault Logger mode
- Time and Date mode
- Parameter Backup mode
- I/O Settings mode
- Summary of I/O connections of application macros
- ABB Standard macro
- wire macro
- Alternate macro
- Motor Potentiometer macro
- Hand/Auto macro
- PID Control macro
- Torque Control macro
- User macros
- List of the tasks and the relevant drive parameters
- Contents of the assistant displays
- Local control
- Block diagram: Start, stop, direction source for EXT1
- Reference types and processing
- Reference trimming
- Example
- Diagnostics
- Settings
- Frequency input
- Actual signals
- Power loss ride-through
- Flux Optimisation
- Constant speeds
- Custom U/f ratio
- Speed controller tuning
- Speed control performance figures
- Scalar control
- External Fault
- Underload Protection
- Drive temperature
- Supervisions
- PID control
- Motor temperature measurement through the standard I/O
- Control of a mechanical brake
- Operation time scheme
- State shifts
- Jogging
- Timed functions
- Counter
- Example 1
- Example 2
- Default values with different macros
- FB ACTUAL SIGNALS
- FAULT HISTORY
- Parameters – short form list
- Parameters – complete descriptions
- REFERENCE SELECT
- ANALOGUE INPUTS
- RELAY OUTPUTS
- ANALOGUE OUTPUTS
- SYSTEM CONTROLS
- FREQ IN & TRAN OUT
- TIMER & COUNTER
- LIMITS
- START/STOP
- ACCEL/DECEL
- SPEED CONTROL
- TORQUE CONTROL
- CRITICAL SPEEDS
- MAINTENANCE TRIG
- FAULT FUNCTIONS
- AUTOMATIC RESET
- SUPERVISION
- INFORMATION
- PANEL DISPLAY
- MOTOR TEMP MEAS
- PROCESS PID SET 1
- PROCESS PID SET 2
- MECH BRK CONTROL
- ENCODER
- PANEL COMM
- FBA DATA OUT
- SEQUENCE PROG
- OPTIONS
- START-UP DATA
- Setting up communication through the embedded modbus
- Drive control parameters
- The fieldbus control interface
- Fieldbus references
- Fieldbus reference scaling
- Reference handling
- Modbus mapping
- Function codes
- Communication profiles
- DCU communication profile
- Setting up communication through a fieldbus adapter module
- Communication profile
- Alarm messages generated by the drive
- Alarms generated by the Basic Control Panel
- Fault messages generated by the drive
- Embedded fieldbus faults
- Fan replacement (R1...R4)
- Battery
- Ratings
- Symbols
- Cooling air flow requirements
- Power cable sizes and fuses
- Power cables: terminal sizes, maximum cable diameters and tightening torques
- Input power connection
- Control connections
- Ambient conditions
- CE marking
- UL marking
- Compliance with the IEC/EN 61800-3 (2004)
- Brake resistors
- Resistor installation and wiring
- Dimensions
- Frame sizes R0 and R1, IP20 (cabinet installation) / UL open
- Frame sizes R0 and R1, IP20 / NEMA 1
- Frame size R2, IP20 (cabinet installation) / UL open
- Frame size R2, IP20 / NEMA 1
- Frame size R3, IP20 (cabinet installation) / UL open
- Frame size R3, IP20 / NEMA 1
- Frame size R4, IP20 (cabinet installation) / UL open
ACS350 Series
Table of contents
- ACS350 drive manuals
- What this chapter contains
- Installation and maintenance work
- Operation and start-up
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table of contents
- Categorization according to the frame size
- Installation and commissioning flowchart
- Overview: Connections
- Delivery check
- Mounting the drive and hygienic installation
- Installing the cable glands (optional, +H376)
- Cable gland kit part list
- Connecting the power cables
- Procedure
- Connecting the control cables
- Checklist
- Cleaning the drive
- Internal fan replacement
- Ratings
- Sizing
- Power cable sizes and fuses
- Ambient conditions
- CE marking
- Compliance with the IEC/EN 61800-3 (2004)
- Product protection in the USA
- Dimensions
- Frame size R1, IP66
- Frame size R3, IP66
- R1 gland plate, with and without sticker
- R3 gland plate, with and without sticker
manualsdatabase
Your AI-powered manual search engine