Samsung DECT 1500 manuals
DECT 1500
Table of contents
- intended use
- Table Of Contents
- Table Of Contents
- Introduction
- Part 1: Site Survey and Overview of DECT Systems
- other considerations
- Information Required
- Site Survey Procedure
- Checklist for Survey Data
- DECT Survey Report Form
- Example Cell Planning Results
- Positioning Base Stations
- Hot Spots
- Final Testing
- Troubleshooting with Base Stations
- Using Repeaters
- Function of Repeaters
- Repeaters in Multi-Cell Systems
- Areas with Low Traffic Intensity
- Displacement of Traffic Capacity Using Repeaters
- Repeaters as Problem Solvers in Multi-Cell Systems
- Repeater Jumps
- Programming
- Configuring the CCFP
- Installing the Expansion Board and IWUs
- Cable Connections
- Power connection
- Serial Connection
- Starting the DECT 1500 System
- DECT 500
- Installing the Base Station/Control Unit (CCFP)
- registering handsets
- Installing and Configuring a Samsung Repeater (WRFP)
- Appendix 1 Deployment Flowchart
- Appendix 2 Traffic Calculations
manualsdatabase
Your AI-powered manual search engine