RBI Infinity Energy 2 manuals
Infinity Energy 2
Table of contents
- installation and operation
- SAFETY INSTRUCTIONS
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- CODE REQUIREMENTS
- commonwealth of massachusetts
- Key to symbols used
- MAIN COMPONENTS
- FUNCTION OVERVIEW
- Intended use and functions
- INSTALLATION - Location
- Prevent combustion air contamination
- Residential garage installation
- INSTALLATION - Mounting the heater
- Dimensions
- IB boiler water connections
- System flushing, treatment, and cleansing
- Supply and return piping
- Near boiler heating piping components
- Relief valve
- Local boiler pump and CH pump
- IW Water heaters' water connections
- INSTALLATION - IW water connections
- Expansion Tank
- Minimum and maximum water flow
- Condensate disposal
- Electrical connections: overview
- INSTALLATION - Electrical connections
- Connection to an analog Vcc input
- Connecting the IB boiler to an indirect water heater
- Connecting the heater in cascade
- Removing of a heater from a common venting system
- CATEGORY IV: Positive pressure condensing
- Minimum / Maximum allowable combustion air and vent piping lengths
- Air inlet pipe materials
- PVC/CPVC vent piping materials
- PVC/CPVC air intake connection
- Stainless steel vent piping materials
- Stainless steel vent connection
- Polypropylene vent piping materials
- Polypropylene air intake connection
- Single pipe vent (not sealed combustion)
- Determine location
- Sidewall termination - Two pipes
- Prepare wall penetrations
- Sidewall termination – Concentric vent
- Multiventing sidewall terminations
- Vertical termination - Two pipes
- Multiple vent/air terminations
- Vertical termination – Concentric vent
- Multiventing vertical terminations
- CAT II: Negative pressure condensing
- Condensing vent option: CATEGORY II
- common venting
- Gas supply piping
- Pipe sizing for natural gas
- Check inlet gas supply pressure
- Convert a heater model 199 from Natural Gas to Propane gas or viceversa
- Convert a heater model 399, 500, 750 or 1000 from Natural Gas to Propane gas or viceversa
- Operating
- START-UP
- Gas supply pressure checking
- Checking and adjusting CO2 levels
- Check the capacity input
- Check water pressure
- IB boiler - Indirect water heater temperature adjustment
- Delays, alarms and protective actions
- Users' menu
- Installer's menu
- Diagnostic
- Diagnostic: Lockouts "Loc
- Diagnostic: Blocking errors "Err
- Flue blocked pressure switch
- MAINTENANCE
- Address reported problems
- Flame inspection
- Shut heater down
- Cleaning the burner and primary heat exchanger, flue gas side
- Thermal insulations
- Correct positioning of the ignition and flame detection electrodes
- Condensate trap and neutralizing box maintenance and cleaning
- Connection of the display to other burners
- How to move a control board
- Draining the water from the heater
- model wiring diagram
- to 1000 models wiring diagram
- SPARE PARTS
- READ OUT FLOW CHART
- FACTORY MENU
- SEQUENCE OF OPERATION for BOILER
- SEQUENCE OF OPERATION for WATER HEATER
manualsdatabase
Your AI-powered manual search engine