Manuals database logo
manualsdatabase
Your AI-powered manual search engine

Nortel Succession 1000M manuals

Succession 1000M first page preview

Succession 1000M

Brand: Nortel | Category: PBX
Table of contents
Succession 1000M first page preview

Succession 1000M

Brand: Nortel | Category: Server
Succession 1000M first page preview

Succession 1000M

Brand: Nortel | Category: Server
Table of contents
  1. Table Of Contents
  2. Table Of Contents
  3. Table Of Contents
  4. Table Of Contents
  5. Table Of Contents
  6. Table Of Contents
  7. Table Of Contents
  8. New in this release
  9. List of Procedures
  10. Getting help from the Nortel Web site
  11. Getting help from a specialist by using an Express Routing Code
  12. on the Nortel web site
  13. System information
  14. Applicable systems
  15. Intended audience
  16. Conventions
  17. Related information
  18. Introduction
  19. Summary of procedures
  20. Preparing for installation
  21. System equipment – UEMs
  22. card cage
  23. System options
  24. signaling server
  25. Cable routing guidelines
  26. Equipment handling precautions
  27. handling circuit cards
  28. denan regulatory notice for japan
  29. Preparing the equipment for installation
  30. Placing the fourth module on a column
  31. Positioning and leveling equipment
  32. Installing AC power
  33. Safety ground/protective earth and logic return wiring
  34. Installing safety ground/protective earth and logic return wiring
  35. Installing UPS ground cabling
  36. Installing overhead cable tray kits
  37. NN43021-310 Standard 02.01 December
  38. Installing DC power
  39. Candeo DC power systems
  40. large candeo modules
  41. small candeo modules
  42. installation reference guide
  43. configuration reference guide
  44. cabling and connecting the grounding leads
  45. connecting the power plant frame ground (or safety ground) leads
  46. four-feed pdu
  47. installing the four-feed pdu
  48. connecting power from the power plant to the pdu
  49. connecting uk power to the four-feed pdu
  50. system monitor connections
  51. Main Distribution Frame
  52. Terminal block requirements
  53. miscellaneous equipment
  54. Installing the Krone cross-connect system (UK)
  55. december 2007
  56. safety warning
  57. Installing Power Failure Transfer Units
  58. Installing a PFTU
  59. Connecting trunks and telephones
  60. Installing QUA6 PFTUs
  61. Configuring the system monitor
  62. Cabling the System Monitor
  63. Alarm interfacing to Candeo
  64. Configuring the alarm ports
  65. Customizing alarms
  66. Connecting a system terminal or modem
  67. Connecting a terminal
  68. Connecting a terminal to a COM port
  69. COM1 and COM2 ports
  70. SDI and COM1 ports
  71. Connecting a modem
  72. Configuring a modem
  73. Connecting a modem to an SDI port
  74. Connecting a modem to switch box, COM2 ports, SDI ports
  75. Single Group system
  76. Core/Net module
  77. Cabling the Core side
  78. Cabling the I/O panel
  79. Cabling the Network side
  80. Configuring and cabling the Clock Controllers
  81. Network Group 0: Shelf 0 to Shelf 1
  82. Inspecting CNI to 3PE factory installed cables
  83. Connecting the Core/Net backplanes
  84. Optioning the System Utility Card
  85. Connecting Core modules to a LAN
  86. Multi Group system
  87. Cabling the Core/Net module backplane
  88. Disconnecting cables from the Core/Net module backplane
  89. Core shelf cabling
  90. Installing the CP PIV to I/O panel cables
  91. Connecting the Core module to a LAN
  92. Cabling a Dual Ring Fiber Network
  93. FIJI card cabling
  94. Installing the Shelf 0 fiber optic ring (ascending)
  95. Installing the Shelf 1 fiber optic ring (descending)
  96. FIJI to FIJI cabling
  97. Connecting the Clock Controller cables
  98. Cabling network modules and loops
  99. Network module connections
  100. Connecting Groups 1 through 7: Shelf 0 to Shelf 1
  101. Connecting the Network modules to the Core/Net modules
  102. Connecting the 3PE cables to the 3PE fanout panels
  103. Cabling a Superloop Network Card – single column
  104. Cabling a Superloop Network Card – multiple columns
  105. Cabling lines and trunks
  106. Cabling an IPE Module or Media Gateway
  107. Connecting lines and trunks
  108. Powering up the system and initial loading
  109. Preparing to power up – AC
  110. Turning AC power ON
  111. Resetting the main circuit breakers (AC power)
  112. Preparing to power up – DC
  113. Installing software
  114. NN43021
  115. Testing Core/Net 1 and Core/Net 0
  116. Performing acceptance tests
  117. Testing the module power supply
  118. Testing the blower unit and thermal sensor
  119. Testing the sysload
  120. Testing the system terminal and system monitor
  121. Testing the PFTU
  122. Installing earthquake bracing
  123. Installing seismic bracing
  124. Drilling concrete floors
  125. Installing Kit A and Kit B anchor plates
  126. Installing earthquake rods
  127. Positioning and leveling the system
  128. Installing non-seismic bracing
  129. Installing a non-seismic anchor kit
  130. Adding a module to a column
  131. Adding a module to the base of a column
  132. Adding a module between two other modules
  133. Adding a module to the top of a column
  134. Installing a Signaling Server
  135. Readiness checklist
  136. Installing the CP PM Signaling Server hardware
  137. Connections
  138. Installing the Signaling Server software
  139. installing the software
  140. First boot of a new Nortel CP PM Signaling Server
  141. Unpacking Help files for Virtual Terminal Emulator
  142. Verifying a successful configuration
  143. Index
Succession 1000M first page preview

Succession 1000M

Brand: Nortel | Category: Server
Related products
Succession CSE 1000Meridian 1 Succession 1000MMeridian 1 Succession 1000Communication Server 1000M1000 Con?guration guideMeridian SL-100 SEOption 11C CompactMeridian Companion 1Meridian Companion SLCompanion PCI
Nortel categories
More Nortel categories
Manuals database logo
manualsdatabase
Your AI-powered manual search engine