• Setting list and configuration• RJ-45 Ethernet cable (CAT 5)• Three-phase test kit or other test equipment depending on the complexity of theconfiguration and functions to be tested.• PC with PCM600 installed along with the connectivity packages corresponding tothe IEDs to be tested.• Administration rights on the PC, to set up IP addresses• Product documentation (engineering manual, installation manual, commissioningmanual, operation manual, technical manual and communication protocol manual)4.3 Checking the power supply M11725-2 v6Do not insert anything else to the female connector but thecorresponding male connector. Inserting anything else (such as ameasurement probe) may damage the female connector and prevent aproper electrical contact between the printed circuit board and theexternal wiring connected to the screw terminal block.Check that the auxiliary supply voltage remains within the permissible input voltagerange under all operating conditions. Check that the polarity is correct beforeenergizing the IED.4.4 Energizing the IED4.4.1 Checking the IED operation M11726-2 v7Check all connections to external circuitry to ensure correct installation, beforeenergizing the IED and carrying out the commissioning procedures.Energize the power supply of the IED to pickup. Keep the DC power supply on untilthe Root menu or the selected default screen is shown on the HMI before interruptingthe DC power supply again. The energization could be done in a number of ways, fromenergizing a whole cubicle with many IEDs to energizing each single IED one by one.If HW (i.e. I/O and/or communication boards etc.) have been changed (i.e. removed,replaced, or added), the user should re-configure the IED by navigating in the localHMI menu to: Main menu/Configuration/Reconfigure HW modules to activate thechanged hardware modules in order to enable the self-supervision function to detectpossible hardware errors.Section 4 1MRK 502 073-UUS AStarting up46 Generator protection REG670 2.2 ANSI and Injection equipment REX060, REX061, REX062Commissioning manual