SiE33-003 Unpacking and Placing the UnitInstallation Manual 1355. Unpacking and Placing the Unit5.1 Unpacking and Placing the Unit1. Remove the wooden crafte from the unit.2. Remove the four screws fixing the unit to the pallet.3. The unit must be installed on a solid longitudinal foundation (steelbeam frame or concrete) as indicatedin figure 5.Bad ExampleNote: Maximum height of the foundation is 150mm.4. Lift the unit from the pallet and place it on its installation position.5. Fasten the unit in place using four anchor bolts M12.6. Remove the upper and lower service plate.7. When closing the service panels take care that the tightening torque does not exceed 4.1 Nm.8. Remove the yellow shipping stays from the compressor support as shown in the figure (2 stays persingle compressor). Tighten the installation bolts firmly again afterwards.Caution 1. Prepare a water drainage channel around the foundation to drain waste water from around the unit.2. If the unit is to be installed on a roof, check the strength of the roof and its drainage facilities first.3. If the unit is to be installed on a frame, install the waterproofing board within a distance of 150mm underthe unit in order to prevent infiltration of water coming from under the unit.Refer “Installation of Outdoor Unit” page 51 for more foundation detail.1. Fundamental bolt position (φ15 holes ... 8 places)1. No!2. Do not use stands to support the corners.128010001280100080806887267501256822901280100080688726760802Fig. 5(V0853)211Fig. 4(V0852)(V0898)Si33-003.book Page 135 Monday, June 25, 2001 9:06 AMВсе каталоги и инструкции здесь: http://splitoff.ru/tehn-doc.html