AK-LM 340 RS8GV202 © Danfoss 2016-06 39Determine the connection pointsAll connections must be programmed with module and point, soin principle it does not matter where the connections are made, aslong as it takes place on a correct type of input or output.• The controller is the first module, the next one is 2, etc.• A point is the two or three terminals belonging to an input oroutput (e.g. two terminals for a sensor and three terminals for arelay).The preparation of the connection diagram and the subsequentprogramming (configuration) should take place at the presenttime. It is most easily accomplished by filling in the connectionsurvey for the relevant modules.Principle:Name On module On Point Functionfx Compressor 1 x x ONfx Compressor 2 x x ONfx Alarm relay x x OFFfx P0 x x AKS 32R 1-6 barThe connection survey from the controller and any extensionmodules are uploaded from the paragraph "Module survey. E.g.controller module:10Signal Module Point Terminal Signal type /Active at1 (AI 1) 1 - 22 (AI 2) 3 - 43 (AI 3) 5 - 64 (AI 4) 7 - 8Mind the numbering.The right-hand part of thecontroller module may look likea separate module. But it isn’t.- Columns 1, 2, 3 and 5 are used for the programming.- Columns 2 and 4 are used for the connection diagram.Module PointSignal Module Point Terminal Signal type /Active atS111 (AI 1) 1 - 2 Pt 1000S2 2 (AI 2) 3 - 4 Pt 1000S3 3 (AI 3) 5 - 6 Pt 1000S4 4 (AI 4) 7 - 8 Pt 10005 (AI 5) 9 - 106 (AI 6) 11 - 12P1 7 (AI 7) 13 - 14 AKS 32R-128 (AI 8) 19 - 209 (AI 9) 21 - 2210 (AI 10) 23 - 24P2 11 (AI 11) 25 - 26 AKS 32R-1212 (DO 1) 31 - 3213 (DO 2) 33 - 3414 (DO 3) 35 - 3615 (DO 4) 37 - 38Relay for valve 16 (DO 5) 39-40-41 ON17 (DO6) 42-43-44Relay for pump A.(Difference pressostat) 18 (DO7) 45-46-47 ONRelay for pump B(Two sensor thermostat) 19 (DO8) 48-49-50 ON24 -25 -