UPS-MOUNTED BYPASS SWITCH INSTALLATIONEaton 9155 UPS (8–15 kVA) User's Guide 164201553 Rev G (www.eaton.com/powerquality)263. Attach the supplied L-bracket to the lower rear (for 2-high) or middle rear (for3-high) cabinet using three screws (see Figure 15).Repeat for the other side.4. Remove the UPS wiring access cover and retain.L-Bracket and ScrewsUPS WiringAccess CoverFigure 15. Attaching the L-Brackets5. Remove the MBM/PDM wiring access cover and one of the conduit landingplates and retain.6. Tilt the top of the module forward and slide the module onto the L-brackets. Thetop left flange on the module fits up under the UPS electronics unit through anaccess slot.MBM/PDMWiring AccessCoverUPS ElectronicsUnitConduit Landing PlatesFigure 16. Installing the MBM or PDM (MBM Shown)