SSppeecciiaall PPrreeccaauuttiioonnss• The unit is heavy: wear safety shoes and use vacuum lifter preferentially for handling operations.• All handling operations will require at least two people (unpacking, lifting, installation in racksystem).• Before and after the installation, if the UPS remains de-energized for a long period, the UPS mustbe energized for a period of 24 hours, at least once every 6 months (for a normal storagetemperature less than 25°C). This charges the battery, thus avoiding possible irreversibledamage.• During the replacement of the Battery Module, it is imperative to use the same type and numberof element as the original Battery Module provided with the UPS to maintain an identical level ofperformance and safety. If there are any questions, don’t hesitate to contact your local EATONrepresentative.• All repairs and service should be performed by AUTHORIZED SERVICE PERSONNEL ONLY.There are NO USER SERVICEABLE PARTS inside the UPS.• For potential safety issue on defective UPS : DISCONNECT INTERNAL BATTERY for storage andtransportation.