Start-UpCopyright © 2007-2012 Eaton Corporation. All Rights Reserved.IPN 997-00012-48D November 2012 35Step 3 - Repeat for other rectifiers or fit blank panels1 Fit the remaining rectifiers.2 Fit rectifier blank panels in any vacant rectifier positions.Procedure completeTask 2 - Pre-Power-Up ChecklistComplete the checklist to confirm initial work is complete before progressing further.All cabling is installed, securely tied and correctly insulatedUpstream surge protection is fitted (see Input Transient Protection on page 81)Earth bonding is correct (see details on page 19)Battery and load cabling has the correct polarityA registered electrician or other suitable approved person has checked the integrity of theinstalled cablingAll panels are in place and all empty rectifier slots are covered with blanking panelsAC isolator and all ac MCBs (if fitted) are switched offAll dc distribution MCBs are switched off and/or fuses removedAC supply is isolated at each point of isolation leading back to the ac supply pointBatteries are electrically isolated from the dc power systemThe site is cleanTask 3 - Applying AC PowerA registered electrician (or suitably qualified person) must check the integrity of theinstalled cabling, BEFORE the dc power system is powered up.1 Switch on the AC supply.All rectifiers start up (after the startup delay).The rectifier alarm LEDs will turn on for a short time.The SC200 or SC100 system controller will turn on (green Power On LED is on) whenthe rectifiers start.During start-up of the system controller the rectifier yellow alarm LEDs will flash untilthe rectifiers are registered.