I.L. 29-885B Page 159.0 REFERENCES I.L 29C714 Master Connection Diagram for Series CR-Frame Circuit Breaker9.1 Digitrip RMS Trip AssembliesI.L. 29-885I.L. 29-886I.L. 29-888APPENDIX A ZONE INTERLOCKINGAssume a ground fault of 2000 Amperes occurs andrefer to Fig A.1.CASE 1: There is no Zone Selective Interlocking.(standard time delay coordination is used)Instructions for Digitrip RMS 510 Trip UnitInstructions for Digitrip RMS 610 Trip UnitInstructions for Digitrip RMS 810 Trip Unit9.2 Type DS Low-Voltage AC Power Circuit BreakersInstructions for Low-Voltage Power CircuitBreakers Types DS and DSLSupplement B to Digitrip RMS Trip UnitsTypical Time-Current CharacteristicCurves for Types DS and DSL CircuitBreakersSC-5619-93 Instantaneous (I)SC-5620-93 Long Delay and Short Delay (LS)SC-5621-93 Ground (G)Connection Diagram for Type DS CircuitBreakersI.B. 33-790-1 Fault 3The branch breaker will trip clearing the fault in0.1 s.I.B. 33-790-1AD 32-870 Fault 2The feeder breaker will trip clearing the fault in0.3 s.Fault 1The breaker will trip clearing the fault in 0.5 s.CASE 2: There is Zone Selective InterlockingFault 3The branch breaker trip unit will initiate the trip in0.03 s to clear the fault and Z3 will send an inter-locking signal to the Z2 trip unit; and Z2 will sendan interlocking signal to Z1.Z1 and Z2 trip units will begin to time out, and inthe event that the branch breaker Z3 would notclear the fault, the feeder breaker Z2 will clear thefault in 0.3 s (as above). Similarly, in the event thatthe feeder breaker Z2 would not clear the fault, themain breaker Z1 will clear the fault in 0.5 s (asabove).508B5089.3 Type SPB Systems Pow-R BreakersI.L. 29-801 Instruction for the Systems Pow-R Breakerand Drawout MechanismSupplementary Instructions for the Sys-tems Pow-R Breaker used with the DigitripRMS Trip UnitsTypical Time-Current CharacteristicCurves for Type SPB Systems Pow-RBreakerInstantaneous (I)Long Delay and Short Delay (LS)Ground (G)SPB Master Connection DiagramI.L. 29-849AD 29-863SC-5623-93 Fault 2The feeder breaker trip unit will initiate the trip in0.03 s to clear the fault; and Z2 will send an inter-locking signal to the Z1 trip unit. Z1 trip unitwillbegin to time out, and in the event that the feederbreaker Z2 would not clear the fault, the mainbreaker Z1 will clear the fault in 0.5 s (as above).SC-5624-93SC-5625-93I.S. 155459.4 Series C® R-Frame Molded Case Circuit Breakers29C106 Frame Book Fault 129C107 Frame Instruction Leaflet There are no interlocking signals. The mainbreaker trip unit will initiate the trip in 0.03 s.29C713 Supplementary Instructions for Series CR-Frame used with the Digitrip RMS TripUnitsTypical Time-Current CharacteristicCurves for R-Frame Circuit BreakersInstantaneous (I)Long Delay and Short Delay (LS)Ground (G)Figure A.2 presents a Zone Selective Interlocking con-nection diagram for a system with two main breakersfrom incoming sources and a bus tie breaker. Note theblocking diode D1 is needed so that the feeder breakerscan send interlocking signals to both the main and tiebreakers, without having the tie breaker send itself aninterlocking signal.AD 29-167RSC-5626-93SC-5627-93SC-5628-93FAT'NEffective May 1997