For more information visit: www.eaton.com IB70-8671Instructional BookletPage 12 Effective: July 2008 O & M Manual for the EGS AutomaticTransfer Switchwith RTC-50 Control and Integral Loadcenter - 100 AmpStep 5: The ATS Time Delay Normal (Utility) to Emergency (Gen-erator) (TDNE) will begin to time after the generatorengine begins to run. After time out, the solenoid willengage and the contactor will automatically switch fromthe UTILITY to the GENERATOR position.Step 6: Close the utility breaker described in Step 1 ofSection 5.2.Step 7: The ATS Time Delay Emergency (Generator) to Normal(Utility) (TDEN) timer will begin timing, and the solenoidwill engage and automatically switch from the GENERA-TOR to the UTILITY position and the generator will shutdown after a cool down period.SECTION 6: ADJUSTMENTS6.1 GeneralRefer to IB00405004E-70-8664, supplied with the ATS forRTC-50 controller adjustments and functions.