Eaton® PowerPass® Distribution Module (2500/3000 VA) User's Guide 164201798 Rev 2www.eaton.com/powerquality11Chapter 2 InstallationThis chapter describes: Equipment inspection Rackmount setup Low-voltage and high-voltage installation for plug-receptacle andhardwired models Rear panels Load segmentsInspecting the EquipmentIf any equipment has been damaged during shipment, keep the shippingcartons and packing materials for the carrier or place of purchase and filea claim for shipping damage. If you discover damage after acceptance,file a claim for concealed damage.To file a claim for shipping damage or concealed damage: 1) File withthe carrier within 15 days of receipt of the equipment; 2) Send a copy ofthe damage claim within 15 days to your service representative.PowerPass Distribution Module SetupNOTE If you are installing the UPS for the first time, follow the instructions in the UPSuser's guide to set up the UPS and any optional Extended Battery Modules (EBMs). Do notconnect your equipment to the UPS or start up the UPS before installing the PowerPassDistribution Module (PDM).If the UPS is already installed and operating, prepare your equipment forshutdown and use the following procedure to shut down the UPS:1. Turn off the equipment that is connected to the UPS.2. Press and hold the Off button for approximately three seconds.The UPS transfers to Standby mode (if utility power is available) andremoves power to your equipment.