|
15XSTORAGE HOME POWER METERS MANUAL MN700001EN March 2019 www.eaton.com/xstorageThe power meter is connected to the terminal RS485 of thexStorage Home system with a 1 mm2 cable as it is shown inthe picture below.Figure 33: How to wire the Easton meters EM1 and EM2 tothe RS-485 port of xStorage HomeTo set up the meters it is important that the appropriate meteris selected from the user interface. Both meters EM1 and EM2should be selected in the user interface. Please refer to thexStorage Home user interface onboarding process manual tosetup the meter in the user interface.It is important to configure the address of EM1 to “001” andthe address of EM2 to “002”. To enter the set-up mode,please hold the “Enter” button for three seconds untilthe password screen appears. The set-up is password-protected so you must enter the correct password(default ‘1000’) before processing.From the set-up menu, use the “M” and “P” buttons toselect “Address ID”.Press the “Enter” button to enter the selection routine.The current setting will be flashing.Use the “M” and “P” buttons to choose the Modbus Address.The address of the power meter 1 must be 1. To exit theset-up mode, press the “Left” button repeatedly until themeasurement screen is restored.For the second power meter EM2 repeat all the steps, previouslymade for power meter EM1. Please note that it is only possibleto setup EM2 after finalizing the installation of EM1.This means that Eastron meter are in set-up status one at a time.Moreover, the Modbus address of the power meter 2 must be 2.Once the addresses of both meters are set as described,finalize the installation of the meters following the onboardingprocess of the user interface. Please refer to the xStorageHome user interface onboarding process manual to setupthe meters in the user interface. The procedure should bedone for both EM1 and EM2. PreviousNext |