Section 3 • Scheduled Maintenance Procedures January 20133 - 8 GS-84 • GS-90 Part No. 84793CHECKLIST A PROCEDURESA-2Perform Pre-operationInspectionGenie specifications require that this procedure beperformed every 8 hours or daily, whichever comesfirst.Completing a Pre-operation Inspection is essentialto safe machine operation. The Pre-operationInspection is a visual inspection performed by theoperator prior to each work shift. The inspection isdesigned to discover if anything is apparently wrongwith a machine before the operator performs thefunction tests. The Pre-operation Inspection alsoserves to determine if routine maintenanceprocedures are required.Complete information to perform this procedure isavailable in the appropriate operator's manual. Referto the Operator's Manual on your machine.A-3Perform Function TestsGenie specifications require that this procedure beperformed every 8 hours or daily, whichever comesfirst.Completing the function tests is essential to safemachine operation. Function tests are designed todiscover any malfunctions before the machine isput into service. A malfunctioning machine mustnever be used. If malfunctions are discovered, themachine must be tagged and removed fromservice.Complete information to perform this procedure isavailable in the appropriate operator's manual. Referto the Operator's Manual on your machine.