Section 3 • Scheduled Maintenance ProceduresJanuary 2013Part No. 84793 GS-84 • GS-90 3 - 11CHECKLIST A PROCEDURESA-7Perform 30 Day ServiceThe 30 day maintenance procedure is a one-timesequence of procedures to be performed after thefirst 30 days or 40 hours of usage. After thisinterval, refer to the maintenance checklists forcontinued scheduled maintenance.1 Perform the following maintenance procedures:Ford models:• A-9 Perform Engine Maintenance -Ford Models• B-7 Inspect the Tires, Wheels andLug Nut Torque• D-4 Replace the Hydraulic FiltersDeutz models:• B-4 Check and Adjust the Engine RPM• B-7 Inspect the Tires, Wheels andLug Nut Torque• C-3 Replace the Fuel Filter/WaterSeparator - Deutz Models• D-4 Replace the Hydraulic FiltersA-8Perform Engine Maintenance -Deutz ModelsEngine specifications require that this one-timeprocedure be performed after 50 hours of operation.Required maintenance procedures and additionalengine information is available in theDeutz 2011 Operation Manual(Deutz part number 0297 9929).Deutz 2011 Operation ManualGenie part number 84794A-9Perform Engine Maintenance -Ford ModelsEngine specifications require that this procedure beperformed every 100 hours or quarterly, whichevercomes first.Required maintenance procedures and additionalengine information is available in theFord LRG-425 EFI Operator Handbook(Ford part number FPP 194-302) OR theFord DSG-423 EFI Operator Handbook(EDI part number 1060020).Ford LRG-425 EFI Operator HandbookGenie part number 84792Ford DSG-423 EFI Operator HandbookGenie part number 119488