3 - 26 Genie Z-45/25 Bi-Energy and Genie Z-45/25J Bi-Energy Part No. 106488July 2004Section 3 • Scheduled Maintenance ProceduresREV AB-20Perform Engine MaintenanceEngine specifications require thatthis procedure be performedevery 400 hours.Proper engine maintenance, following the enginemanufacturer's maintenance schedule, is essentialto good engine performance and service life.Failure to perform the maintenance procedurescan lead to poor engine performance andcomponent damage.Required maintenance procedures and additionalengine information are available in theKubota Z482-E Operator's Manual(Kubota part number 16676-89163).Kubota Z482-E Operator's ManualGenie part number 52958To access the engine:1 Remove the engine pivot plate latch retainer.2 Open the engine pivot plate latch and swing theengine out away from the machine.CHECKLIST B PROCEDURES